Factory floor ready for the heavy machines

The new factory has been secured in the bedrock with 49 meter long piles and the factory floor has been reinforced to accommodate the 131 tonnes of heavy production equipment. The heavy unload of equipment is secured by experienced heavy lift engineers.

Subscribe

Subscribe to our news